Skip to main content

Reports

The Reports page displays reports for your projects, test suites, and test cases. To view the relevant information, in the dropdown box, select Project, Test Suites, or Test Cases.

There are two options for viewing report dates: Actual Date (Default) and Relative Date. The actual date is the date the report was created, while the relative date is the time since the report was created.

To download the information on the Reports page, click the Download button and then click Download CSV or Download XLSX

The Reports page

Reports Page Columns

ColumnDescription
NameThe name of the project, test suite, or test case the report is for.

Click the up or down arrow next to the column name to sort the table by name.
Start TimeActual Date (Default) - The date the report was created.

Relative Date - The time since the report was created.

Click the up or down arrow next to the column name to sort the table by date.
TotalThe total number of tests run in the project, test suite, or test case.

Click the up or down arrow next to the column name to sort the table by total number of tests.
PassedThe number of tests that were run that passed.

Click the up or down arrow next to the column name to sort the table by the number of tests that passed.
FailedThe number of tests that were run that failed.

Click the up or down arrow next to the column name to sort the table by the number of tests that failed.
Product BugThe number of product bugs that were found.
Automation BugThe number of automation bugs that were found.
Execution HistoryClicking the Execution History button opens the Execution History page. See Execution History Page for more information.